wdt_ID | URAIAN | SATUAN | 2019 | 2020 | 2021 | 2022 |
---|---|---|---|---|---|---|
1 | Jumlah Gardu Induk | UNIT | 1 | 1 | 1 | 1 |
2 | Kapasitas Terpasang Trafo Induk | MVA | 46 | 76 | 76 | 262,3 |
3 | Beban Puncak Trafo GI Parepare | MW | 15.12 | 16 | 16 | 11,94 |
4 | Rata-Rata Produksi / Bulan | Kwh | 10,745,771 | 11,420,214 | 11.420.214 | 44.834.400 |
5 | Jumlah Produksi / Satuan | Kwh | 128,949,253 | 137,042,568 | 137.042.568 | 1.494.480 |
6 | Nilai Produksi | RUPIAH | 189,168,554,151 | 189,168,554,151 | 189.168.554.151 | 73.842.256.800 /bulan |
8 | Jumlah Karyawan | ORANG | - | 56 | 56 | 10 (ULP Mattirotasi) |
9 | Penunjang Gardu Induk Parepare | |||||
10 | Gardu Induk Barru | MVA | 20 | 26.3 | 26 | 26,3 |
11 | Gardu Induk Pinrang | MVA | - | 60 | 60 | 76 |
URAIAN | SATUAN | 2019 | 2020 | 2021 | 2022 |
Sumber : PT. PLN (Persero) Cabang Parepare